SEA & HRA for the 2015 Drought Plan | Dwr Cymru Welsh Water
Dwr Cymru Welsh Water

Monday, 17th February

With flooding still affecting many communities in Wales and Herefordshire, we are experiencing high volumes of calls due to the high winds and heavy rain and our crews are extremely busy.

Here are the organisations you may need to contact:

Natural Resources Wales - 0800 80 70 60 (24 Hours) - if the flooding is coming from a watercourse (such as a stream) that is about to or has burst its banks.

Your Local Council – if you suspect the flooding is resulting from rising groundwater or surface water run off.

Welsh Water Sewerage Services & Emergencies - 0800 085 3968 (24 hours) or report an issue via a webform – for flooding inside your property caused by a blocked or overloaded sewer.

My Water Water Resources SEA & HRA for the 2015 Drought Plan

SEA & HRA for the 2015 Drought Plan

Dŵr Cymru Welsh Water’s Drought Plan was considered within, and influenced by, the Strategic Environmental Assessment (SEA) and the Habitats Regulations Assessment (HRA) that accompany the Drought Plan. The SEA and HRA were published for consultation and comment at the same time as the draft Drought Plan.

Consultation Process

The responses to this consultation have been included within the main Statement of Response

Addendum HRA Report

An Addendum report has been published by the HRA to reflect changes made to the supply side drought options as a result of the representations made during the consultation period.

  • HRA of of final drought plan options 

Post Adoption Statement

The Post Adoption Statement sets out the following:

  • The reasons for the Drought Plan being adopted.
  • How environmental considerations have been integrated into the Drought Plan.
  • How findings of the SEA Environmental Report have been taken into account in the Drought Plan.
  • How consultation on the SEA Environmental Report and draft Drought Plan has been taken into account in the development of the Final Drought Plan and,
  • The monitoring measures that have been identified.

The Post Adoption statement has now been prepared and is available here.

Aa